Business Operation · 2025
In this section22 topics
- Corporate Information4 items
- Dividend Policy2 items
- Major Shareholders1 item
- Business Strategies Overview5 items
- Material Changes & Developments1 item
- Use of Proceeds from Securities Offerings2 items
- Commitments Made in the Registration Statement2 items
- Group Operating-Structure Policy1 item
- Companies Where the Company Holds ≥10%1 item
- Shareholders with Potential Conflict of Interest1 item
- Relationships Among Major Shareholders1 item
- Shareholders' Agreement1 item
- Shareholding Diagram (Group Structure)3 items
- Income Structure3 items
- Product / Service Characteristics2 items
- Research & Development2 items
- Assets Used in the Business6 items
- Marketing Policy & Competition3 items
- Procurement of Products & Services8 items
- Projects Under Construction7 items
- Debentures & Bills of Exchange2 items
- Convertible Securities1 item
Corporate Information
Company Name
RIGHT TUNNELLING PUBLIC COMPANY LIMITED
Telephone
0-2313-4780
Website
https://www.rtco.co.th/
rt@rtco.co.th
Dividend Policy
Dividend Policy
The Company has a policy to pay dividend at a rate of not less than 40% of net profit after corporate income tax and legal reserve, including other reserves based on its separated financial statements. However, the Company may consider changing the dividend payment depending on performance, financial status, liquidity, investment plan, and other necessities in the future. Therefore, the resolution of the board that approves the dividend payment must be presented to the shareholders' meeting for approval. However, the BOD has an approval authority to approve the interim dividend payment if deemed appropriate. The payment must be reported to the shareholders at the next shareholders’ meeting.
Historical Dividend Payments
| This Year | Last Year | 2 Years Ago | 3 Years Ago | 4 Years Ago | Metric | Description |
|---|---|---|---|---|---|---|
| 0.01 | 0.06 | 0.04 | -0.28 | Net profit per share (Baht : Share) | Net profit per share (baht : share) | |
| 0 | 0 | 0 | 0 | Dividend per share (Baht : Share) | Dividend per share (baht : share) | |
| 0 | 0 | 0 | 0 | 0 | Dividend stock ratio (Number of original shares: dividend shares) | Ratio of stock dividend payment (existing share : stock dividend) |
| 0 | 0 | 0 | 0 | Dividend share value per share (Baht : Share) | Value of stock dividend per share (baht : share) | |
| 0 | 0 | 0 | 0 | Total dividend payment value (Baht : Share) | Total dividend payment (baht : share) | |
| 0 | 0 | 0 | 0 | Dividend payout ratio to net profit (%) | Dividend payout ratio compared to net profit (%) |
Business Strategies Overview
Chairman's Message
2025 was the year that Right Tunnelling Public Company Limited faced significantly challenging economic conditions, including global market volatility and uncertainty stemming from conflicts and an unstable economic constraints. Nevertheless, with dedication and the collective cooperation of all stakeholders, most notably our shareholders and employees, whose continued support and active participation in the Company's various activities has been invaluable. We were able to navigate through this difficult period. The unweavering support of our shareholders and the tireless efforts of our employees have been a great power that drives the Company forward. Our resilience and teamwork were key factors that enabled the Company to maintain business continuity throughout the past year.
The Company would like to express sincere gratitude to all shareholders and employees for their contributions to this success. We look forward to your continued support and cooperation, so that we may grow and develop sustainably across all dimensions. In closing, the Company reaffirms its commitment to conducting business with transparency, accountability, and sustainability, with the aim of creating lasting value and benefit for all shareholders and stakeholders.
Dr. Songpope Polachan
Chairman of the Board
Right Tunnelling Public Company Limited
Vision
Keeping ahead in civil engineering and geotechnical construction with customer’s satisfaction always.
Objectives
To carry out construction business with quality and sustainable growth
To perpetuate organizational administration and development on safety and ethics among employees with the concept of good governance towards sustainable growth
To emphasize on potential development of human resources development in line with organizational growth
To provide appropriate and fair benefits to shareholders and stakeholders
To be responsible to community, society and environment
Goals
Achieve an average revenue growth rate of no less than 25% and a net profit margin of no less than 40%
Apply Artificial Intelligence (AI) technology as a core tool for process optimization, with the aim of reducing redundancy, lowering operational costs, and enhancing decision-making accuracy
Conduct business in accordance with sustainability principles through concrete ESG initiatives, encompassing environmental responsibility, improvement of community quality of life, and adherence to good governance in transparent management — in order to create long-term value and strengthen the Company's reputation as a trusted organization at the international level
Business Strategies
Place strong emphasis on maintaining professional standards through Quality Control at every stage of production or service delivery, ensuring that all outputs meet the Specifications agreed upon with clients. This is coupled with efficient management of resources and timelines to deliver work within the stipulated deadlines — thereby building Trust and sustaining long-term positive relationships with clients.
A strategy focused on taking on short-term projects that can be completed and invoiced quickly. This strategy aims to accelerate the cash cycle, reduce capital tied up in long-term projects, and strengthen the organization's overall financial liquidity.
Material Changes & Developments
Material Changes & Developments
| Year | Description |
|---|---|
| 2,000 |
|
| 2,005 |
|
| 2,008 |
|
| 2,009 |
|
| 2,010 |
|
| 2,011 |
|
| 2,012 |
|
| 2,013 |
|
| 2,014 |
|
| 2,015 |
|
| 2,016 |
|
| 2,017 |
|
| 2,019 |
|
| 2,020 |
|
| 2,021 |
|
| 2,022 |
|
| 2,023 |
|
| 2,024 |
|
| 2,025 |
|
Use of Proceeds from Securities Offerings
Is There Money Raised from a Securities Offering Still to Report On?
Yes
Offerings
| Type of Securities | Amount Raised Given As | Amount Raised (Million Baht) | Uses of the Money | Used as Declared? |
|---|---|---|---|---|
| Debt Instruments | 2873 | 96.3 | 2026-02 · Objective: To redeem maturing bonds/debentures (roll-over) · Period type: 2871 · Start period: 2026-02 · Spent amount type: 2873 · Start spent amount: 96.3 · Expected amount type: 2873 · Start expected amount range: 96.3 | Y |
Commitments Made in the Registration Statement
Introduction
ผู้ออกหุ้นกู้จะดำรงไว้ซึ่งอัตราส่วนของ "หนี้สินที่มีภาระดอกเบี้ย" ต่อ "ส่วนของผู้ถือหุ้น" (Interest Bearing Debt to Equity Ratio) ตาม งบการเงินรวมประจำปีของผู้ออกหุ้นกู้ในอัตราส่วนไม่เกิน 2.5 เท่าและ 3 เท่า ณ วันสิ้นงวดบัญชีของแต่ละปีตลอดอายุหุ้นกู้
นอกเหนือจากหลักประกันหรือภาระผูกพันต่าง ๆ ที่ผู้ออกหุ้นกู้ได้ให้ไว้หรือทำขึ้นก่อนวันออกหุ้นกู้ ผู้ออกหุ้นกู้จะไม่จำนอง จำนำ หรือก่อภาระหลักประกันหรือภาระผูกพันใด ๆ เหนือทรัพย์สินและ/หรือรายได้สำคัญที่ใช้ในการประกอบธุรกิจของผู้ออกหุ้นกู้ทั้งในปัจจุบันและอนาคต ตลอดเวลาที่ยังคงมีหนี้ตามหุ้นกู้และข้อกำหนดสิทธินี้ค้างชำระอยู่ เว้นแต่การจำนอง จำนำ หรือก่อภาระหลักประกัน หรือภาระผูกพันใด ๆ ดังกล่าวจะเกิดขึ้นเนื่องจากเหตุอย่างใดอย่างหนึ่ง
ผู้ออกหุ้นกู้จะไม่ประกาศจ่ายเงินปันผลในกรณีที่ผู้ออกหุ้นกู้ไม่ชำระเงินต้นและ/หรือดอกเบี้ยหุ้นกู้ที่ถึงกำหนดชำระแล้ว หรือมีเหตุผิดนัดหรือเหตุการณ์ที่อาจกลายเป็นเหตุผิดนัดเกิดขึ้น ทั้งนี้ เว้นแต่จะได้รับอนุญาตจากที่ประชุมผู้ถือหุ้นกู้ก่อน
Are There Commitments or Conditions from an Offering or Listing?
No
Group Operating-Structure Policy
Description
The company operates in only construction business.
Companies Where the Company Holds ≥10%
Companies (≥10% Holding)
| Company Name | Address | Province | Zip Code | Telephone | Fax | Business Type | Security Type | Shares | Paid-up Shares |
|---|---|---|---|---|---|---|---|---|---|
| Right Tunnelling Myanmar Company Limited | No.1110, Byamaso Street, 4 Block, South-Okkalapa Township, Yangon | 023134780 | 1. Construction Services 2. Office Building Design Planning Services 3. Engineering Architecting and Advertising Service 4. Geotechnical and Water Resources Civil Engineering Consulting 5. Mining and Petroleum Engineering Consulting 6. Water from the Artesian Well, Environment, and Industry Consulting 7. Administrative, Marketing, and Procurement Consulting | Common shares | 150,000 | 150,000 | |||
| Right Tunnelling-Vichitbhan Construction Joint Venture | 292 Moo 4, Bangna-Trad (Km. 26) ,Bangbor, Bangbor, Samut Prakarn, 10560 | Samut Prakarn | 10560 | 023134780 | 023134787 | Construction of Mae Saluom Dam Project Chiang Mai | Common shares | 0 | 0 |
| Right Tunnelling-Sahaburana Technology Joint Venture | Moo 4, Bangna - Trad Road Km. 26, Bang Bor Bang Bor, Samut Prakarn 10560 | Samut Prakarn | 10560 | 023134780 | 023134787 | Construction of Pipe Jacking Work | Common shares | 0 | 0 |
| ITD-RT Joint Venture | 2034/132-161 Italthai Tower, New Petchaburi Rd, Bang Kapi, Huai Khwang, Bangkok 10310 | Bangkok | 10310 | 027161600 | Construction Project of Track Doubling for Northeastern Line Map Kabao - Thanon Chira Junction, Contract 3: Railway Tunnel | Common shares | 0 | 0 | |
| MKRT Joint Venture | 292 Moo 4, Bangna - Trad Road Bang Bor Bang Bor, Samut Prakarn 10560 | Samut Prakarn | 10560 | 023134780 | Construction Project of Highway 42: Ban Khlong Ngae – Su-ngai Kolok Permanent Border Post, Ban Tonon – Ban Lam Ching Section | Common shares | 0 | 0 | |
| PV-RT-BCL Joint Venture | 292 Moo 4, Bangna - Trad Road Bang Bor Bang Bor, Samut Prakarn 10560 | Samut Prakarn | 10560 | 023134780 | Construction of Raw Water Reservoir of Bang Pakong Power Plant, Chachoengsao Province | Common shares | 0 | 0 | |
| Rudee Prayong-Right Tunnelling Joint Venture | 292 Moo 4, Bangna - Trad Road Km. 26, Bang Bor Bang Bor, Samut Prakarn 10560 | Samut Prakarn | 10560 | 023134780 | For construction bidding: Slope Protection Work of Chantuk - Klong Khananchit Railway Station Project with State Railway of Thailand with State Railway of Thailand | Common shares | 0 | 0 | |
| Right Tunnelling- Bangkok civil line Joint Venture | 292 Moo 4, Bangna - Trad Road Km. 26, Bang Bor Bang Bor, Samut Prakarn 10560 | Samut Prakarn | 10560 | 023134780 | Soil improvement works beneath the water pipeline (Jet Grout Block for Cut-and-Cover Tunnel, Type 1–2), Orange Line Project (Contract E1: Underground Civil Works) | Common shares | 0 | 0 | |
| VCRT Joint Venture | 292 Moo 4, Bangna-Trad, Bang Bo, Bang Bo, Samut Prakarn, 10560 | Samut Prakarn | 10560 | 0966366600 | Construction of Highway No. 42 (Khlong Ngae – Su-ngai Kolok Permanent Border Crossing), Section Ban Ton Non – Ban Lam Ching, from Km. 15+000.000 to Km. 25+720.000, with a total distance of approximately 10.720 kilometers | Common shares | 0 | 0 | |
| Right Tunnelling-SIA Joint Venture | 292 Moo 4 Bangna-Trad Road, Bang Bo, Bang Bo, Samut Prakarn, 10560 | Samut Prakarn | 10560 | 023134780 | Construction works for manholes and underground cable ducts for 115 kV power supply (Circuit SIT-796), for a tie line crossing beneath the 230 kV transmission line of the Electricity Generating Authority of Thailand (EGAT), along Bang Phai–Ban Nong Phrao Ngai Road, to supply electricity to Khun Si Substation at Point 4, Khlong Sip Sok, Nong Phrao Ngai Subdistrict, Sai Noi District, Nonthaburi Province | Common shares | 0 | 0 |
Income Structure
Product / Service Income
| Category | Description | This Year | This Year % | Last Year | Last Year % | 2 Years Ago | 2 Years Ago % |
|---|---|---|---|---|---|---|---|
| Total revenue from operations | Total revenue from operations | 3,496.51 | 100 | 3,635.78 | 100 | 3,150.95 | 100 |
| Tunnel & Shaft Construction | 1,913.26 | 54.72 | 2,290.65 | 63 | 1,682.75 | 53.4 | |
| Dam Construction and Irrigation System | 359.89 | 10.29 | 610.09 | 16.78 | 585.88 | 18.59 | |
| Hydro Power Plant | 608.22 | 17.4 | 372.34 | 10.24 | 149.85 | 4.76 | |
| Pipe Jacking & Horizontal Directional Drilling | 138.06 | 3.95 | 214.94 | 5.91 | 255.73 | 8.12 | |
| Other Works | 431.6 | 12.34 | 106.34 | 2.92 | 439.43 | 13.95 | |
| Other | Others | 45.48 | 1.3 | 41.42 | 1.14 | 37.31 | 1.18 |
Export Income
| Category | Description | This Year | This Year % | Last Year | Last Year % | 2 Years Ago | 2 Years Ago % |
|---|---|---|---|---|---|---|---|
| Total revenue | Total revenue | 3,496.51 | 100 | 3,635.78 | 100 | 3,150.95 | 100 |
| Domestic | Domestic | 2,842.81 | 81.3 | 3,225.02 | 88.7 | 2,959.85 | 93.94 |
| International | International | 653.7 | 18.7 | 410.76 | 11.3 | 191.1 | 6.06 |
Other Income
| Operating Other Income | Non-Operating Other Income | Share of Profit |
|---|---|---|
| 1710 · As of year: 22.54 · Description: Total other income · As of yesteryear: 25.67 · As of year before yesteryear: 14.0 · 1711 · As of year: 25.18 · Description: Other income from operations · As of yesteryear: 12.75 · As of year before yesteryear: 23.0 | 1712 · As of year: 0.0 · Description: Other income not from operations · As of yesteryear: 0.0 · As of year before yesteryear: 0.0 | 1713 · Description: Share of profit |
Product / Service Characteristics
Business Type
3114
Business Groups
| Business Group | Description |
|---|---|
| Tunnel and Shaft Construction | 1. Tunnel and Shaft Construction Tunnel construction requires complex techniques, including construction methods, engineers’ high expertise and experience, efficient construction tools and measuring instruments as it is an underground construction in a confined space with limited fresh air and work obstacles of ingress water as well as varying soil or rock strata which is unforeseen by its nature. Because unconformity of rock strata is quite common in construction. Change of the structure design based on the conditions of soil and rock is necessary. The Company’s tunnel construction can be divided into 3 types as follows: 1) Tunnel in the Dam / Water Tunnel as part of irrigation work, tunnel as part of Hydro Power Plant work such as Diversion Tunnel for water diversion in dam construction, Water Tunnel, and Downstream Tunnel 2) Railway Tunnel 3) Road Tunnel The three types of tunnel construction differ in several aspects, including construction techniques and methods, geological conditions, support systems, tunnel lining construction, tunnel alignment, material and equipment transportation routes, surrounding environmental conditions at the construction site, and internal tunnel systems such as ventilation and signaling systems. |
| Dam Construction and Irrigation System | 2. Dam Construction and Irrigation System Dam is the infrastructure used for water resources development by retaining excess water to beneficial use. Dam construction requires interdisciplinary dam technology such as water and hydraulic engineering, civil engineering and geology, electrical engineering, mechanical engineering, and environmental engineering. Dam utilizations are namely, domestic uses, irrigation, power generation, flood protection, communication, fishery, and tourism and recreation. |
| Hydro Power Plant | 3. Hydro Power Plant The Company is the operator of hydro power plant construction both mini and large size, power plant downstream, as well as all structures such as mini hydroelectric development project and civil work. Moreover, the Company is a contractor of reinforce concrete structure work for power house and irrigation such as intake and spillway structure, concrete chimney, and navigation lock. |
| Pipe Jacking & Horizontal Directional Drilling | 4. Pipe Jacking and Horizontal Directional Drilling and Open Cut Microtunnelling has been developed and derived from drilling and tunnelling technology. Nowadays, Microtunnelling technology is widely adopted in such construction works as pipelines undercrossing road intersections, pedestrian underpass, pipelaying in waste water drainage and treatment, gas pipeline, raw water supply or treated water supply pipes, electrical conduits or duct banks, telephone lines, communication signal lines as well as other communication systems. Using the same drilling control system and similar stabilizing system, all are called in different technical names i.e., Microtunnelling, Pipe Jacking (PJ), pipe bursting, Horizontal Directional Drilling (HDD) etc. |
| Others | 5. Others The Company is the operator of slope stabilization, earth and rock excavation both blasting and drilling, geological exploratory drilling, grouting work, mining work, rail work, road and bridge, and others. |
Research & Development
Has R&D Policy (Y/N)
No
R&D Cost — Label
Research and development (R&D) expenses over the past 3 years (Million Baht)
Assets Used in the Business
Permanent Assets — Description
The major fixed assets of Right Tunneling Public Company Limited used in its business operations as of December 31, 2024 (Unit: Million Baht), are detailed as follows:
Permanent Assets — Appraisal
| Asset | Ownership | Obligation | Appraisal Value | Description |
|---|---|---|---|---|
| Land | Freehold / Owned Outright | Mortgaged as collateral for credit facilities with financial institutions | 103.09 | Used as site for construction project operations |
| Buildings and Structures | Freehold / Owned Outright | Mortgaged as collateral for credit facilities with financial institutions | 46.22 | Used for business operations |
| Machinery and Equipment | Freehold / Owned Outright | Partial | 399.84 | Used for business operations |
| Tools and Implements | Freehold / Owned Outright | None | 61.45 | Used for business operations |
| Furniture, Fixtures and Office Equipment | Freehold / Owned Outright | None | 8.08 | Used for business operations |
| Vehicles | Freehold / Owned Outright | None | 21.68 | Used for business operations |
| Assets under Installation and Construction | Freehold / Owned Outright | None | 23.98 | Used for business operations |
| Right-of-Use Assets (Asset Category) | Freehold / Owned Outright | Subject to hire-purchase agreement | 181.74 | Used for business operations |
Intangible Assets — Description
As of December 31, 2025, the company has intangible assets, specifically computer software, with a book value of Baht 8.99 million.
Intangible Assets — Appraisal
| Asset | Type | Appraisal Value | Description |
|---|---|---|---|
| Computer software | Software | 8.99 | Used for business operation |
Has Subsidiaries Investment Policy (Y/N)
Yes
Subsidiaries Investment Policy — Description
The Company has a policy to invest in subsidiaries and associates primarily engaged in the Company’s core businesses or businesses related to or similar to the Company’s operations. Such investments are carefully considered based on the return on investment, risks, and the Company’s financial liquidity. These investments must be reviewed and approved by the Company’s Board of Directors and the shareholders’ meeting in accordance with the specified approval authority.
Furthermore, the investments must comply with the rules and notifications of the Capital Market Supervisory Board and the Stock Exchange of Thailand, as well as relevant laws, regulations, and announcements. The Company will oversee these investments by appointing the Company’s directors and/or executives as representatives to serve on the boards of the subsidiaries and associates to ensure that their management direction and policies align with the Company’s business operations.Supervision of Operations of Subsidiaries and AssociatesThe Company will appoint its representatives as directors of subsidiaries and associates. These representatives may serve as the chairman of the board, company director, chairman of the executive committee, managing director, senior executives, or any person with suitable qualifications and experience in the relevant business and without any conflict of interest with the subsidiaries or associates.The Company’s representatives who serve as directors of subsidiaries must manage and operate the subsidiaries in accordance with the Company’s guidelines, regulations, including the subsidiaries’ delegation of authority, and relevant laws. This ensures the Company’s investment is protected and allows the Company to supervise, manage, and be accountable for the subsidiaries’ operations as if they were part of the Company itself.Therefore, the Company’s Board of Directors’ Meeting No. 3/2020, held on May 14, 2020, resolved to approve the policy for supervising the operations of subsidiaries and associates, with the following key details:
1. Management Control Policy for Subsidiaries and Associates
The Company establishes guidelines for exercising voting rights by its representatives at the shareholders’ meetings of subsidiaries and associates on matters such as director elections and remuneration, auditor appointments, profit allocations, and consideration of other matters not specified in the meeting agenda.The policy also specifies matters requiring prior approval from the Company’s Board of Directors or the shareholders’ meeting (as the case may be). The Company will monitor the performance of subsidiaries and associates to ensure alignment with the plan, including disclosure of related party transactions by subsidiaries. Subsidiaries are required to establish adequate and appropriate internal control systems, disclose and submit information about their directors, executives, and related parties, and safeguard against the misuse of inside information.Additionally, the Company sets out specific matters or agendas requiring approval from the Board of Directors or the shareholders’ meeting of the Company, categorized by significance.
2. Financial Control Policy for Subsidiaries and Associates
The Company requires subsidiaries and associates to submit their operating results, quarterly financial statements, and supporting information for the preparation of consolidated financial statements or the Company’s quarterly performance reports. Subsidiaries and associates must also promptly report any significant financial issues to the Company upon discovery or when requested by the Company for review and reporting.
Furthermore, the Company assigns its directors the duty of continuously monitoring the performance of subsidiaries and associates to ensure compliance with plans and budgets. Subsidiaries must also disclose related party transactions and acquisitions or disposals of assets to the Company in accordance with the relevant notifications of the Capital Market Supervisory Board and the Stock Exchange of Thailand.
Marketing Policy & Competition
Reporting Mode
3117
Marketing Policy (Overall)
The Company's construction operation can be divided into 2 types:
1) Main Contractor: The Company directly submits proposals in its own name, as contractor through bidding, or negotiates with the project owners directly, including works from government agencies, state enterprises, and private sectors. In the acceptance of projects in this manner, the Company does not solely carry out the entire construction work, but may also subcontract parts of such work.
2) Subcontractor: The Company accepts work from other contractors that were awarded the work directly from project owners. The work of this nature would mostly be large sized, high value, and sophisticated, or requiring construction contractors with various capabilities and fields of experience. A single main contractor may not have adequate experience or skills to proceed with all steps of the work and deliver the project on time, so they must hire other subcontractors such as installation of electrical and mechanical systems, reinforcement bar cutting, bending and tying of reinforced concrete work, erection of concrete formworks and concrete placing, geological investigation and sampling collection, and services such as transporting trucks etc.
The Company has expertise in construction engineering and geotechnical work. The Company is committed to delivering the highest quality construction on time for long-lasting customer satisfaction, with a specialized and experienced team. The Company operates construction engineering and geotechnical businesses with works meeting construction quality standards, safety, occupational health, and working environment. Apart from this, the Company's portfolio is available for customers on the Company's website at http://rtco.co.th/
The Company serves both domestic and international customers. The domestic customers can be divided into 3 groups, namely government agencies, state enterprises, and private sectors. For international customers, the major customers are from the private sector. The domestic customers can be divided into 3 groups as follows:
1) Government Agencies
Government agencies are the major domestic customers of the Company. In 2025, revenue from government agency customers accounted for 21.45 percent of total construction service revenue. As government agencies lay the foundation of the country's infrastructure, which is a significant basis for national development, the establishment of government policies and construction projects promotes the private sector to participate in investing in various government projects. The government agency customers of the Company include the Royal Irrigation Department, Department of Mineral Resources, Department of Highways, Department of Water Resources etc.
2) State Enterprises
State enterprises are organizations in which the government is the major shareholder or owner. They are organizations controlled and owned by the federal government but intended for profit. In 2025, revenue from domestic state enterprise customers accounted for 3.31 percent of total construction service revenue. The state enterprise customers of the Company include the Electricity Generating Authority of Thailand (EGAT), Metropolitan Electricity Authority (MEA), Provincial Electricity Authority (PEA), State Railway of Thailand (SRT) etc.
3) Private Sector
The private sector plays a significant role in construction investment in the country. In 2025, revenue from domestic private sector customers accounted for 75.24 percent of total construction service revenue. The private sector customers of the Company include Italian-Thai Development Public Company Limited, Nawarat Patanakarn Public Company Limited etc. Additionally, the Company has international private sector customers such as CH. Karnchang (Laos) Company Limited etc.
Industry & Competition (Overall)
Nowadays, there are more than 80,000 of construction company (Department of Business Development, 2018). Most of large-sized contractors are the listed companies. The differences of large-sized contractors and SMEs are as follows:
Procurement of Products & Services
Reporting Mode
3117
Procurement (Overall)
The company operates a construction contracting business, procuring construction materials and related services under a quality management system covering the entire process from vendor selection and quality inspection through to project delivery to owners.
Key construction materials used in operations include ready-mixed concrete, structural steel, cement, sand, piles, high-tensile steel wire, fuel oil, and shotcrete admixtures. The company prioritizes domestic procurement, and where importation is necessary, purchases are made through experienced in-country distributors with after-sales service capabilities. The ratio of domestic to international procurement is approximately 94% and 6% respectively.
In terms of vendor and supplier management, as of 2025 the company had a total of 366 registered primary material vendors, comprising 344 domestic and 22 international suppliers. For key materials with significant impact on construction schedules, the company diversifies its vendor base to mitigate risk, maintaining a policy of not relying on any single vendor for more than 30% of revenue, in order to promote fair competition and reduce the risk of material shortages.
The value of key material purchase orders for 2023–2025 trended in line with construction volume in each respective year. In 2025, the highest-value materials procured were ready-mixed concrete at Baht 388.99 million, followed by structural steel at Baht 237.71 million, and fuel oil at Baht 122.06 million, reflecting the expansion of construction workload undertaken during the period.
Regarding the procurement and quality assessment process, the company requires each purchase and service order to be approved by senior management, with procurement contracts executed to secure the best terms and price stability throughout each project. Vendor evaluations are conducted at least twice per year, assessing quality, price, delivery, and reliability. Vendors are also required to be responsible for the quality of their goods and services for a minimum of two years, or as stipulated in the contract.
The company has implemented an ERP (Enterprise Resource Planning) system in its procurement process since 2019 to enhance efficiency in purchase order issuance, data recording, and inventory management.
Raw Material Acquisition (Overall)
In procuring construction materials for construction service, the Company has procured from both domestic and overseas, but mostly domestic, except for the specific material available only from abroad depending on the employer’s contract. The procurement will follow the Company’s procurement policy, there will be an approval and procurement plan. Comparing the prices from vendor list at least 2 vendors, except special goods that have a specification and have only one dealer. However, it must be approved from the authority first and then make a purchase at the appropriate price.
Previously, the Company has never encountered a procurement problem or a material shortage, except for the construction material price risk such as steel, metal, and concrete etc., especially the steel’s price which fluctuate following demand and supply of the world market. The fluctuation of material prices might affect the Company’s cost management. However, the Company has followed up the news and material prices trend all the time to be able to manage the project costs efficiently. The Company did not rely on any particular dealer because their materials are for a general construction, so there are plenty of them. The Company has procurement steps, comparing the prices at least 2 vendors and conduct evaluation of the dealer in a specified period, to make sure that the materials have quality and appropriate price for the Company’s best interest.
Communication of Products and Services
The Company is concerned with communication channels and advertisement of its portfolio. Operating performance of completed and ongoing projects are presented in total of 5 business segments: Tunnel and Shaft Construction, Dam and Irrigation System, Hydropower Plant, and Pipe Jacking and Horizontal Directional Drilling, and other works. The Company also publicizes the news in concerns with appropriate wordings, avoiding exaggerated statements that may cause misunderstanding on the subject matter of the products or services.
Production Policy (Overall)
The procurement policy aims to ensure that the purchasing departments of Right Tunneling Public Company Limited and all relevant parties are aware of the importance of purchasing goods or services through honest business methods. This means having a transparent process that promotes fair competition among suppliers, ensures the selection of suitable vendors, and guarantees the acquisition of high-quality products that meet standards. Additionally, the policy ensures that the maximum value for money is achieved, and vendors are evaluated based on their capabilities and the quality of their products.
Distributors (Overall)
It is a business partner that provides and supplies the materials necessary for the company's construction projects in accordance with requirements. Additionally, the business in question has no familial relationship between directors and executives, nor any vested interest in the company or legal entities that may have a conflict of interest at present.
Number of Raw-Material Distributors (Overall)
5
Production Capacity (Overall)
| Item | Unit | Unit (if Other) | Used | Capacity |
|---|---|---|---|---|
| Construction Project | Others | Project | 31 | 31 |
Domestic/Overseas Purchase Proportion (Overall)
| Raw Material | Source Country | Value |
|---|---|---|
| Concrete | Thailand | 388,991,431.59 |
| Fuel | Thailand | 122,059,126.82 |
| Construction steel | Thailand | 237,709,389.02 |
| Shotcrete Accelerator | Thailand | 163,400,000 |
Projects Under Construction
Has Projects Under Construction (Y/N)
Yes
Description
As of the end of the fiscal year 2025, the Company has ongoing projects as follows:
Total Projects
31
Total Project Value
16321214159.79
Recognized Value
9893424584.96
Remaining / Unrecognized Value
6427789374.83
Projects
| Project Name | Value | Income % | Est. Years | Est. Months | Est. Completion |
|---|---|---|---|---|---|
| 1. Major Civil Works of the Permanent Structure of the Luang Prabang Hydroelectric Power Project | 1,776 | 63.6 | 6 | 5 | 2028-06-01 |
| 2. Construction of Underground Cable Duct Banks and Manholes in Conjunction with Bang Sue Development Area, Phahon Yothin Transportation Hub, and Smart City Project | 139 | 99.1 | 3 | 9 | 2026-02-01 |
| 3. Construction of Underground Cable Duct Banks, Manholes, Water Supply Pipelines and Related Works for Local Highway Connecting Vibhavadi Rangsit Road and Phahon Yothin Road, Section 2 | 112 | 95.4 | 4 | 11 | 2026-04-01 |
| 4. Construction of Highway No. 42, Ban Khlong Ngae – Sungai Kolok Border Crossing, Ban Ton Non – Ban Lam Ching Section, km 15+000 – km 25+720 | 57 | 94.5 | 4 | 8 | 2026-02-01 |
| 5. Construction of Highway No. 42, Ban Khlong Ngae – Sungai Kolok Border Crossing, Ban Ton Non – Ban Lam Ching Section, km 15+000 – km 25+720 | 559 | 93.6 | 4 | 6 | 2026-03-01 |
| 6. Construction of Underground Power Transmission Tunnel Crossing the Chao Phraya River from Phra Nakhon Tai Source Substation to Sukhasawat Road | 100 | 28.3 | 3 | 0 | 2026-05-01 |
| 7. Construction of Drainage Tunnel at Khlong Thawi Watthana Bottleneck Area | 1,734 | 93.8 | 4 | 9 | 2026-09-01 |
| 8. Construction of Water Conveyance Tunnel along Maha Sawat Canal, Shaft No. 9A-1 and 9A-2, Contract G-TN-9A | 1,336 | 98.3 | 4 | 0 | 2026-04-01 |
| 9. Railway Construction Project, Den Chai–Chiang Rai–Chiang Khong Line, Contract 1: Den Chai–Ngao Section | 2,175 | 61.2 | 3 | 6 | 2027-01-01 |
| 10. Underground Cable Conversion Project along Orange Line (East) MRT Corridor, Phetchaburi Road | 520 | 54 | 3 | 6 | 2026-07-01 |
| 11. Railway Construction Project, Den Chai–Chiang Rai–Chiang Khong Line, Contract 2: Ngao–Chiang Rai Section | 2,080 | 94.2 | 4 | 10 | 2027-12-01 |
| 12. Construction of Main Dam, Appurtenant Structures and Other Components, Khlong Phlo Reservoir Project | 467 | 91.8 | 3 | 0 | 2026-04-01 |
| 13. Construction of Earth Embankment Dam and Appurtenant Structures, Khlong Aeng Reservoir Project | 663 | 86.2 | 3 | 6 | 2026-07-01 |
| 14. Slope Protection Package 3, 4+5, Den Chai–Chiang Rai–Chiang Khong Railway Construction Project, Contract 2 | 377 | 38.2 | 2 | 7 | 2026-09-01 |
| 15. Slope Protection Package 4+5, Den Chai–Chiang Rai–Chiang Khong Railway Construction Project, Contract 3 | 152 | 38.37 | 2 | 2 | 2026-09-01 |
| 16. Highway Restoration No. 4028, Ha Yaek Chalong–Karon Section, Part 1 at km 2+350 LT. | 21 | 99.8 | 1 | 6 | 2026-08-01 |
| 17. Highway Restoration No. 4030, Thalang–Hat Rawai Section, km 14+800 – km 15+250 | 31 | 90.69 | 1 | 0 | 2026-03-01 |
| 18. Highway Restoration No. 402, Khok Kloi–Mak Prok Section, Part 1, km 13+100 – km 21+500 | 22 | 12.75 | 1 | 1 | 2026-05-01 |
| 19. Flood-Damaged Infrastructure Restoration, Highway No. 1349, Samoeng–Wat Chan Section, Parts 3 and 4 | 93 | 29.17 | 0 | 8 | 2026-03-01 |
| 20. Construction of Drainage Tunnel beneath Khlong Phra Khanong from Phra Khanong Tunnel Pumping Station to Khlong Suan Oi | 835 | 6.43 | 2 | 3 | 2027-12-01 |
| 21. Flood-Damaged Infrastructure Restoration, Highway No. 1155, Sai Kat–Ban Lung Section, Part 7 | 28 | 16.51 | 0 | 7 | 2026-05-01 |
| 22. Pipe Roof Works MRT-OR05, Orange Line, Bang Khun Non–Min Buri | 30 | 0 | 0 | 7 | 2026-06-01 |
| 23. Construction of Wastewater Collection and Treatment System, Nonthaburi Provincial Administrative Organization (Critical Zone 1) | 233 | 1.1 | 2 | 4 | 2028-02-01 |
| 24. Slope Improvement Works at Dam Site Area, Huai Ru Reservoir Project under Royal Initiative, Phayao Province | 38 | 0 | 0 | 10 | 2026-11-01 |
| 25. Construction of Water Conveyance Tunnel and Appurtenant Structures, Mae Taeng–Mae Ngat Section, Contract 2, Mae Kuang Udom Thara Dam Water Augmentation Project, Chiang Mai Province | 2,614 | 2.02 | 5 | 0 | 2030-12-01 |
| 26. Highway Restoration No. 1349, Samoeng–Kanlayaniwadhana Section, Parts 2, 6 and 8 | 16 | 0 | 0 | 5 | 2026-05-01 |
| 27. Highway Restoration No. 1290, Kio Kan–Chiang Khong Section, Parts 8 and 9 | 6 | 0 | 0 | 5 | 2026-05-01 |
| 28. Highway Restoration No. 21, Nong Bong–Phu Sawan Section, Part 3 | 18 | 0 | 0 | 6 | 2026-06-01 |
| 29. Highway Restoration No. 106, Don Chai–Huai Ya Sai Section, Part 1 | 9 | 0 | 0 | 6 | 2026-06-01 |
| 30. Highway Restoration No. 1155, Ban Pi–Sai Kat Section, Part 4 | 9 | 0 | 0 | 7 | 2026-07-01 |
| 31. Highway Restoration No. 107, Mae Thalai–Hua Tho Section, Parts 1 and 2 | 55 | 0 | 0 | 6 | 2026-07-01 |
Debentures & Bills of Exchange
Has Debentures (Y/N)
Yes
Debentures
| Debenture Name | Interest Rate (%) | Outstanding | Maturity Date | Term | Types |
|---|---|---|---|---|---|
| RT262A - High-Risk Debentures of Right Tunnelling Public Company Limited No. 1/2022 Tranche 1 Due 2026 with the Issuer's Right of Early Redemption | 5.25 | 412.1 | February 11, 2026 | 3.5 | 2789 · Description: Senior Debenture · 2791 · Description: Unsecured Debenture |
| RT278A - High-Risk Debentures of Right Tunnelling Public Company Limited No. 1/2022 Tranche 2 Due 2027 with the Issuer's Right of Early Redemption | 5.75 | 174.9 | August 11, 2027 | 5 | 2789 · Description: Senior Debenture · 2791 · Description: Unsecured Debenture |
| RT26NA - High-Risk Debentures of Right Tunnelling Public Company Limited No. 1/2024 Tranche 1 Due 2026 with the Issuer's Right of Early Redemption | 7.25 | 98.6 | November 7, 2026 | 2 | 2789 · Description: Senior Debenture · 2791 · Description: Unsecured Debenture |
| RT27NA - High-Risk Debentures of Right Tunnelling Public Company Limited No. 1/2024 Tranche 2 Due 2027 with the Issuer's Right of Early Redemption | 7.5 | 124.7 | November 7, 2027 | 3 | 2789 · Description: Senior Debenture · 2791 · Description: Unsecured Debenture |
| RT27DA - High-Risk Debentures of Right Tunnelling Public Company Limited No. 1/2025 Tranche 1 Due 2027 with the Issuer's Right of Early Redemption | 7.1 | 35.4 | December 4, 2027 | 2 | 2789 · Description: Senior Debenture · 2791 · Description: Unsecured Debenture |
| RT28DA - High-Risk Debentures of Right Tunnelling Public Company Limited No. 1/2025 Tranche 2 Due 2028 with the Issuer's Right of Early Redemption | 7.25 | 60.9 | December 4, 2028 | 3 | 2789 · Description: Senior Debenture · 2791 · Description: Unsecured Debenture |
Convertible Securities
Has Convertible Securities (Y/N)
No