Risk Management · 2025

Risk Management Policy & Plan

Policy & Plan Description

The Company has conducted risk management policies systematically, considered it as a main policy to develop the Company. There is an incident management, threat management, and other factors that might impact the objectives achievement and the Company’s goals. The Company also conducted risk management team including every department that related to understand and work in the same direction, follow up enterprise-wide risk management, and risk analysis in the main project. There are 6 types of risks:

1. Emerging Risk

2. Strategic Risk

3. Operational Risk

4. Financial Risk

5. Compliance Risk

6. Investment Risk

Risks to the Company's Business Operations

Risk Register

Risk NameRisk CharacteristicsConsequencesManagement MeasuresRelated Risk Factors
Economic risk

The economic conditions have an impact on the expansion of construction contracting businesses, as both economic growth and slowdowns affect investments from both the public and private sectors, which in turn impacts the company's revenue. This is because a significant portion of the company's revenue comes from the government, and the government's investment budget fluctuates with the growth and slowdown of the domestic economic cycle. Therefore, this factor affects the company's revenue, and it is crucial to consider the risks associated with economic conditions and the economic growth rate.

Impact on Revenue

Since the company’s main revenue comes from government contracts, a slowdown in the domestic economy may lead to reduced government budget allocations or delays in the investment of various projects. This could result in the company losing revenue from construction projects.


Impact on Expansion

In an uncertain economic environment, expanding into new markets such as the CLMV countries (Cambodia, Laos, Myanmar, and Vietnam) may face challenges from heightened competition or difficulties in developing business in new markets, as well as an impact on customer base expansion.


Impact on Competitiveness

If the company is unable to adapt to economic conditions or efficiently acquire new clients, it may lose its competitive edge in the market.

Diversification of Revenue Sources

The company has expanded its customer base into the CLMV countries to diversify the risk of relying on domestic government revenue. By entering high-growth potential markets such as Cambodia, Laos, Myanmar, and Vietnam, the company may reduce the impact of the domestic economic slowdown.


Strengthening Relationships with Government and Private Sectors

Building trust with both domestic and international government and private sectors by leveraging experience and expertise in civil engineering and geotechnical contracting ensures that the company continues to be trusted and maintains opportunities for ongoing projects.


Development of Skills and Innovation in Construction

The company should invest in technologies and innovations that can help reduce costs and improve work efficiency, as well as provide training and skill development for employees to maintain its competitive edge in the market.


Financial Planning and Cash Flow Management

During periods of economic uncertainty, the company should have strong cash flow management, such as setting aside reserves or entering into contracts with stable clients and suppliers, to better cope with economic unpredictability.

1715 · Description: Economic risk · Info category: STRATEGIC_RISK · 737 · Other name: Civil unrest, War conditions · Description: Other · Info category: STRATEGIC_RISK
Government policy risk

The risk from changes in government policies arises from adjustments, delays, or reductions in the budget allocated for infrastructure development, such as road construction, bridges, or other related projects. This directly affects the operations of construction contracting companies that rely on government contracts. If policy changes result in reduced investments or budget allocations, the company may not receive the expected government contracts.

Impact on Revenue

Changes in government policies may result in the company losing opportunities to secure government contracts, such as reductions in the budget for infrastructure development or changes in budget allocations. This could lead to a decrease or instability in the company's revenue.


Impact from Inability to Adapt

If the company fails to keep up with policy changes and cannot adjust its plans to secure new contracts in a timely manner, it may lose opportunities to acquire new projects from the government or other partners.

Regular Monitoring of Government Policies

The company should have a system in place to quickly and efficiently track changes in government policies. This can be done by closely following updates from government agencies, such as studying new policies or attending relevant meetings. This will allow the company to plan and adjust strategies for securing contracts appropriately.


Building Strategic Partnerships

The company should foster and maintain strong relationships with government agencies and business partners to exchange valuable information and stay informed about potential policy changes. Participating in government meetings, seminars, or activities will help the company prepare and adjust its strategies in a timely manner.


Continuous Project Planning

The company should proactively plan for upcoming projects and contracts that may be secured from the government by assessing the risks of policy changes. It should also create alternatives for generating revenue from other sources to ensure continuous income.


Adaptability and Flexibility

The company should develop its ability to adapt and remain flexible in response to changes in government policies. This could involve expanding services to the private sector or foreign markets to reduce reliance on government contracts alone.

730 · Description: Government policy · Info category: STRATEGIC_RISK
Risk from government budget disbursement

The risk of government budget disbursement arises from delays in allocating and disbursing funds to contractors, particularly when the company has construction projects supported by the government. If the budget disbursement is delayed or there are internal issues within government agencies, the company may not receive payment as scheduled. This could be due to complex or slow disbursement processes within government agencies or financial issues within agencies with limited budgets.

Impact on Liquidity

If the company does not receive the budget disbursement on time, it may face financial liquidity issues, making it unable to pay contractors, labor wages, or construction material costs as scheduled. This could lead to delays in operations and potentially force the company to halt work temporarily until payments are received.


Impact on Project Delivery

If the company cannot execute the project according to plan or there are delays in delivering work, it may face issues with the client, which could damage trust and long-term relationships. This could result in fines or damage to the company's reputation in the market.


Impact on Company Image

Delays in budget disbursement may negatively affect the company's image regarding its ability to manage budgets effectively. This could result in the company losing future opportunities for contracts from both government and private sectors.


Impact on Financial Risk

If the company is unable to receive payments as expected from government projects on time, it may need to seek alternative financing options, such as using credit lines or sourcing additional capital. This could lead to higher financial costs.

Preparation of Credit Line

The company should develop a financial plan by establishing a credit line reserve to handle the risks associated with delayed disbursements. This could include managing liquidity to ensure that funds are available to cover labor wages or construction materials until payments are received.


Regular Monitoring of Budget Disbursement Status

The company should closely track the status of budget disbursements from the relevant government agencies and collaborate with these entities to ensure timely payments. Additionally, building strong relationships and understanding the disbursement procedures of government bodies is essential for this process.


Diversifying Revenue Sources

Since the company works with both state-owned enterprises and private sector clients, it can mitigate risks by expanding its customer base and taking on private sector projects. This reduces reliance on government budget disbursements as the sole source of revenue.


Long-Term Financial Planning

The company should create a long-term financial strategy to manage delayed disbursements, including evaluating liquidity both short-term and long-term. This will help the company effectively handle unforeseen circumstances.


Regular Risk Assessment and Evaluation

The company should conduct regular assessments and evaluations of the risks associated with budget disbursements. By evaluating ongoing projects, the company can adjust its management strategies and be prepared for potential issues that may arise.

737 · Other name: Risk from government budget disbursement · Description: Other · Info category: STRATEGIC_RISK
RIsk of Climate change and disasters (ESG risk)

Physical and Environmental Risks

The company is directly and indirectly impacted by continuous flooding and heavy rainfall, which may affect construction projects in multiple ways, including work stoppages causing project delays, damage to machinery, worker accommodations, equipment, and construction materials, and increased expenditures for flood prevention or mitigation measures. The company has developed risk mitigation plans, such as monitoring water conditions, tracking and measuring rainfall through weather forecasts, securing machinery and materials in safe locations, and planning work schedules in advance in alignment with on-site geographical conditions.

Transition Risks

Global pressure to reduce greenhouse gas emissions is compelling Thai industries to adopt more environmentally friendly production processes. The company has assessed the impact across three dimensions: (1) corporate reputation and image, (2) the cost of transitioning business processes to be more environmentally friendly, and (3) new laws and regulations enacted by the government, particularly the Climate Change Act, which is expected to be enacted in 2026.

Impacts from Physical and Environmental Risks

Project Disruptions

Flooding or heavy rainfall can halt construction activities, preventing the project from proceeding as planned, which results in delayed delivery of work beyond the scheduled timeline.


Damage to Machinery and Materials

Machinery, equipment, and construction materials may be damaged by flooding or extreme weather conditions, leading the company to incur additional costs for repairs or replacements.


Costs of Natural Disaster Prevention

Implementing flood monitoring systems or installing flood prevention equipment may increase the company’s operating costs.


Impacts from Transition Risks

Cost of Adjustments

Modifying processes and technology to be more environmentally friendly may incur high costs, including expenses related to research and development (R&D) or changes in the production structure.


Compliance with New Regulations

The risk of needing to comply with new environmental regulations, such as restrictions on greenhouse gas emissions, may force the company to invest in process adjustments to meet these requirements.

Physical and Environmental Risk Management Measures

Water and Rainfall Monitoring and Surveillance

The company must monitor and track water conditions and rainfall levels through weather forecasts in order to adjust work plans appropriately in response to changing weather conditions.

Safe Storage of Materials and Machinery

Construction machinery and materials must be stored safely away from severe weather conditions, such as relocating machinery and materials out of flood-prone areas.

Advance Work Planning

Work plans must be aligned with climatic conditions and weather changes in order to minimize the impact of natural disasters.

Transition Risk Management Measures

Production Process Adjustment

The company may need to develop and adapt its work processes to comply with greenhouse gas emission standards, such as using environmentally friendly construction materials and adopting technologies that help reduce emissions.

Compliance with New Laws and Regulations

The company must review and adapt to comply with new environmental laws and regulations in order to avoid penalties and legal issues.

1717 · Description: ESG risk · Info category: STRATEGIC_RISK · 1719 · Description: Climate change and disasters · Info category: STRATEGIC_RISK
Discontinuity of revenue from construction revenue risk

The risk of revenue shortage arises when the company faces a shortage of backlog or is unable to continuously secure new contracts. Should existing projects conclude before new work is obtained, this would directly impact the company's internal resource management and its ability to maintain long-term financial stability.

Impact on Revenue

Should no new projects be added to the backlog before current projects are completed, construction contracting revenue will decline or may come to a halt, resulting in a loss of revenue continuity.

Impact on Operations

The absence of new projects may force the company to suspend or slow down work across various projects, affecting the management of resources such as personnel, machinery, and construction equipment, and resulting in financial losses.

Impact on Profit Retention

Without new projects, operations will lack the revenue necessary to cover various expenses, potentially causing the company's profitability to decline.

Revenue Forecasting from Ongoing and New Projects

The company has developed a revenue forecasting plan for ongoing projects (Billing) to predict future income. This includes monitoring the status of new projects that will be bid on (Project Pipelines) in preparation for securing new work.

Increasing Backlog

If ongoing projects are completed, the company will prioritize securing new work to reduce the risk of project shortages. Special focus will be placed on fields where the company has expertise, such as tunnel excavation and geotechnical engineering work.


Building Partnerships and Joint Ventures

The company will aim to strengthen relationships with partners or other companies it has previously worked with to bid on projects in the form of joint ventures (Joint Venture) or subcontracting (Subcontractor). This strategy helps increase opportunities for new contracts.


Maintaining Work Quality and Building Credibility

The company will strive to deliver high-quality work in both government and private sector projects to build credibility with employers and clients. This will increase the chances of securing continuous new projects and maintaining trust from clients.

1725 · Description: Income volatility · Info category: FINANCIAL_RISK
Competition risk

The company must compete with larger contractors that possess greater financial capacity and are able to submit lower bids, as companies with lower financing costs and higher working capital hold a competitive advantage.

Impact on Profit Margins

If the company must compete with larger contractors who have lower costs and higher working capital, it may be forced to submit lower bid prices in order to win contracts. This could lead to reduced profit margins or even losses if the bid price is too low.


Impact on Operations

A reduction in profit margins could result in limited resources for the company to operate or invest in new machinery and technology. This might decrease the overall efficiency and performance of the business.


Impact from Market Competition

Intense competition from larger contractors could prevent the company from winning bids. Even if it does win a contract, it may need to operate at higher costs, making it difficult to generate an adequate profit.

Utilizing Expertise in Specialized Construction Work

The company focuses on bidding for projects that require specialized expertise, such as geotechnical work and civil engineering. These projects are complex and demand experience and advanced machinery. As a result, the company is able to select projects with lower competition, providing a competitive advantage.


Using Modern Machinery and Efficient Management

The company has invested in modern machinery sufficient for geotechnical work, enabling efficient operations and cost reduction. This allows the company to offer competitive bid prices while maintaining quality and profitability.


Maintaining Reputation and Experience in the Market

The company has an established reputation among both domestic and international clients through its delivery of large-scale projects and expertise in geotechnical work. The company is able to leverage its reputation and track record to instill confidence in clients.


Closely Monitoring Construction Projects

The company closely tracks upcoming construction projects and gathers information about upcoming tenders. This allows the company to prepare and make timely decisions regarding which projects to bid on, ensuring they are ready to capitalize on the right opportunities.

1714 · Description: Competition risk · Info category: STRATEGIC_RISK
Faulty estimate of operating costs risk

The risk arises from inaccurate construction cost estimation or deviations from the actual costs incurred, which can result from several factors, such as incorrect predictions of equipment or material prices, errors in estimating the amount of work or the time required for construction, or unforeseen fluctuations in material prices. An inaccurate cost estimate can have severe impacts on bid pricing and project profitability.

Impact on Profit Margins

If the cost estimation is inaccurate and the actual costs are higher than expected, it could result in reduced profit margins or even losses, especially if the bid price was set too low or did not account for future cost fluctuations.


Impact on Project Execution

Inaccurate cost estimation may require the company to allocate additional financial resources or find ways to raise funds to cover these discrepancies, which could cause delays in project execution or prevent the project from being completed on time.

Precise and Detailed Cost Estimation

Before undertaking any project, the company ensures that a thorough and appropriate cost estimation is established based on accurate and comprehensive data. This includes setting a bid price with a reasonable profit margin to reduce the risk of discrepancies.


Expert Review

Project managers and engineering teams will review the cost estimation details at every step to ensure accuracy, especially for materials, equipment, and time assessments.


Regular Review of Cost Estimates

The company will regularly review and update cost estimates for ongoing projects, especially when there are changes in material or equipment prices that may affect project costs. This review process helps the company plan and allocate additional budgets in a timely manner.


Utilization of Tools and Technology for Cost Estimation

The company employs advanced technology and tools for cost estimation, such as automated cost calculation programs and material databases, to ensure the accuracy and up-to-date nature of the cost estimations.

755 · Other name: Faulty estimate of operating costs risk · Description: Other · Info category: OPERATIONAL_RISK
Fluctuation on construction material and fuel prices risk

The risk arises from fluctuations in the prices of construction materials such as steel, cement, gravel, sand, fuel, and other materials used in construction. These prices fluctuate based on global supply and demand factors, especially in cases of unforeseen events such as wars, natural disasters, or economic factors that cause material prices to rise. Additionally, the price of fuel used for transportation and construction machinery has a direct impact on costs, introducing uncertainty in the overall project cost.

Higher-Than-Expected Costs

Volatility in material and fuel prices may cause construction costs to exceed initial estimates, resulting in the company bearing costs beyond those stipulated in the contract.

Impact on Profit Margins

When material or fuel prices rise, the company may be required to absorb costs exceeding initial projections, potentially reducing project profit or even resulting in losses where contract prices cannot be adjusted.

Impact of Cost Changes in Government Projects

For government projects under fixed-price contracts (without K-factor price adjustment), the company must absorb increased costs arising from changes in construction material prices without being able to claim compensation.

Impact on Project Selection Decision-Making

Uncertainty in material and fuel prices may require the company to exercise careful consideration when deciding whether to participate in projects, as unpredictable cost risks affect the ability to take on new work.

Forward Purchase Contracts

In periods of high volatility in key material prices, the company may consider entering into forward purchase contracts to lock in material prices, enabling projects to maintain profitability and manage budgets with greater precision.


Use of Price Adjustment Formula (K Value) in Government Contracts

When working with the government, the company has implemented a price adjustment formula (K value) that can be modified according to changes in material and fuel prices. If the price of materials or fuel increases, the company will receive compensation according to the rate specified in the contract. Conversely, if prices decrease, the company will compensate the government client.


Negotiating Flexible Contract Terms

The company may consider negotiating flexible contract terms that allow for price adjustments and include clauses that help reduce the risk of price changes. For example, adding provisions to adjust prices when material or fuel prices fluctuate.


Supply Chain Management

The company should implement measures to manage the supply chain effectively, ensuring that materials are purchased at stable prices. This reduces the risk of material shortages or unexpected price hikes.

740 · Description: Shortage or fluctuation in pricing of raw materials or productive resources · Info category: OPERATIONAL_RISK
Project delay risk

Risks from Delays in Construction Projects refer to the risks arising from delays in project execution, which may result from various factors. These factors include internal company operations, such as errors in resource management like labor or material shortages, actions by the client, such as failing to deliver the site on time or making changes to project details that cause delays, and external impacts like war, natural disasters or crises

Increased Costs

Delays in project execution lead to additional costs, such as penalties, expenses for extending the project timeline, or overtime costs incurred to expedite project completion.


Loss of Credibility

If the company fails to deliver the work on time, it will negatively impact its reputation and credibility in the competitive market, which may result in the company losing opportunities for future project bids.


Penalty Charges

If the company fails to meet the contractually agreed deadlines, the client has the right to impose penalties, which could affect the project's profitability or even lead to losses.


Impact on Client Relationships

Delays may cause tension between the company and the client, potentially resulting in the loss of trust and the inability to secure future projects from that client.

Risk Assessment Before Accepting a Project

The company should conduct a thorough risk assessment of each project before deciding to accept or bid on it. The evaluation must consider various factors that may cause delays, such as issues in sourcing materials, labor shortages, and changes in the project plan from the client.


Clear Work Plan Definition

To ensure that the project is completed on time as stipulated in the contract, the company should have a clear work plan from the outset, with resources properly allocated. Additionally, regular monitoring and tracking of progress should be conducted to ensure adherence to timelines.


Negotiating for Time Extensions in Case of Unforeseen Events

In cases of unforeseen events (such as the COVID-19 pandemic or natural disasters), the company should negotiate with the client for an extension of the project timeline or request an exemption from penalties depending on the situation.


Efficient Resource Management

Effective resource management, such as sourcing construction materials in advance, preparing labor in readiness, and utilizing technology to track work progress, will help reduce the risk of delays.


Reviewing and Improving Operational Processes

Working closely with the client to ensure timely delivery of necessary materials or spaces and adhering to the terms outlined in the contract is vital. Additionally, promptly addressing issues as they arise will help ensure smooth operations.


Contingency Planning and Flexibility

Having contingency plans in place for persistent problems or unexpected situations, such as having alternative materials or adjusting work procedures based on changing environments, will allow the project to proceed with flexibility and adaptability.

743 · Description: Product obsolescence · Info category: OPERATIONAL_RISK · 746 · Description: Delays in the development of future projects · Info category: OPERATIONAL_RISK · 755 · Other name: Civil unrest, war conditions · Description: Other · Info category: OPERATIONAL_RISK
Information technology risk

Information technology risks refer to the risks arising from the reliance on technology in business operations, such as storing important data, managing computer systems, and connecting to networks. These risks may involve data leakage, loss, or theft, as well as the potential disruption of technological systems, which could impact business operations and competitiveness.

If an event occurs where critical data is stolen or lost, or if the technology system malfunctions, it will impact the company's operations, causing delays in decision-making, loss of customer trust, and disruptions in business processes. This may result in the company missing business opportunities and incurring additional costs to recover systems and data.

The company has developed a plan to mitigate IT risks by installing adequate backup power systems, maintaining server rooms according to standards, implementing firewalls and logs to prevent network intrusions, connecting computer systems through domains to control security, and having a data recovery plan in place in the event of system disruptions. Additionally, the company also backs up data on cloud systems for recovering lost data, including the establishment of a Security Operations Center (SOC) to monitor and detect intrusions. In the event of any anomalies, the system will issue an alert, allowing personnel to respond and resolve the issue immediately.

1720 · Description: System disruption risk · Info category: OPERATIONAL_RISK
Subcontractor employment risk

Subcontractor risk refers to the risks arising from a company’s reliance on external contractors to perform certain tasks in a project. These tasks may require specialized expertise, such as system installations, architectural work, or transportation. The company must manage and supervise the work of these subcontractors to ensure the project proceeds according to the agreed-upon plan in the contract. This risk stems from errors made by subcontractors or external parties, which could result in delays or damages to the project.

If subcontractors' work is substandard or contains errors, it could lead to delays in the project, potentially resulting in contract breaches and wasted time. Additionally, there may be extra costs for rectifying issues or repairing mistakes made. This could also negatively impact the company’s reputation and future trust with clients.

The company has established a policy to manage this risk by selecting subcontractors who are reliable and experienced in the required areas. The quality of subcontractors is assessed before hiring by reviewing their work history, ability to meet deadlines, and adherence to the company’s standards. Additionally, the company closely monitors the subcontractors' work to ensure the project proceeds as planned.

755 · Other name: Subcontractor employment risk · Description: Other · Info category: OPERATIONAL_RISK
Personels risk

The risk of a shortage of skilled personnel with specialized expertise in the construction business, specifically in civil engineering and geotechnical fields, refers to the risk that the company is unable to find or retain personnel with the necessary specialized skills required for business operations. This may arise from dissatisfaction with compensation, a lack of capable labor, or the resignation of experienced employees, resulting in the company's inability to efficiently execute projects.

If the company is unable to retain or attract specialized talent, it may result in several negative impacts on project execution and business development, such as delays in operations or the need to hire less skilled personnel, which could lead to a decrease in work quality. This could harm the company's reputation and result in additional costs for training or outsourcing labor.

If the company is unable to retain or attract personnel with specialized skills, it will have an impact on project execution and business development. This may result in delays in operations or force the company to hire less skilled personnel as replacements, which would lead to a reduction in work quality. This could negatively affect the company’s reputation and incur additional costs for training or hiring external labor.

738 · Description: Reliance on employees in key positions · Info category: OPERATIONAL_RISK
Corruption risk

Corruption risks in the construction industry arise from the company's interactions with government officials in various activities, particularly in managing contracts with the public sector. The collaboration between the company and government officials may lead to unethical practices, such as bribery, corruption in bidding processes, or the abuse of positions for personal gain. This could stem from competitive pressures or the desire to succeed in projects assigned by the government.

If corruption or fraudulent activities occur within the company, it can have severe consequences, such as legal penalties, damage to the company’s reputation, or the loss of future opportunities for government contracts. Additionally, it can negatively impact relationships with clients or business partners and lead to a decline in organizational trust. Corruption within the company may result in the loss of resources for project execution or cause delays in operations, which can ultimately affect the company's financial performance.

The company has implemented measures to prevent and reduce the risk of corruption by establishing strict policies and measures, including an internal control system and regular audits. Additionally, the company has declared an anti-corruption policy and joined the Thai Private Sector Collective Action Against Corruption (CAC) initiative to promote transparency in business operations. The company has also set policies and practices to regulate gift-giving, hospitality, and activities that may involve corruption, ensuring that employees at all levels adhere strictly to regulations and ethical standards.

754 · Description: Corruption · Info category: OPERATIONAL_RISK
Human rights risk

Human rights risks arise from the potential violation of individuals' fundamental rights in the company's business activities, such as unfair treatment of employees or failure to adhere to human rights standards in employment practices, unsafe working conditions, or the violation of rights of stakeholders involved in the business, including employees, partners, or local communities. Human rights violations may occur due to non-compliance with principles or international standards regarding the rights of individuals within the organization or its supply chain.

If the company violates human rights, it can have both direct and indirect impacts on several areas, such as:

Legal Impact

The company may face legal actions or be held accountable for human rights violations, which could result in significant costs and time spent on legal proceedings.


Reputation Impact

Human rights violations can tarnish the company’s reputation in the market and among the public. This may lead to a loss of trust from customers, partners, and investors, who may choose to cease doing business with the company.


Operational Impact

The company may experience operational difficulties or internal conflicts, which could affect production and long-term business operations.

To manage human rights risks, the company adheres to international principles and standards, such as the United Nations Global Compact (UNGC) and the Universal Declaration of Human Rights (UDHR). The company implements a comprehensive Human Rights Due Diligence process, which consists of five key components:

1. Assessing Human Rights Risks

The company evaluates human rights risks across all business processes.

2. Establishing Preventive and Corrective Measures

The company defines measures to prevent and address identified risks.

3. Regular Monitoring and Compliance

The company ensures ongoing monitoring and adherence to human rights principles.

4. Transparent and Verifiable Reporting

The company creates transparent and verifiable reports on human rights practices and outcomes.

5. Employee Awareness and Organizational Culture

The company ensures that employees at all levels are knowledgeable about human rights principles and fosters a corporate culture that respects human rights.

753 · Description: Impact on human rights · Info category: OPERATIONAL_RISK
Liquidity risk

Liquidity risk arises from the company's inability to manage working capital sufficiently or appropriately, which is critical for construction contracting businesses. Such businesses require substantial capital for the procurement of raw materials, operational supplies and equipment, and labor costs. Liquidity risk also arises from financial liabilities with scheduled repayments at various intervals, comprising overdrafts and short-term borrowings from financial institutions, trade payables and other current payables, long-term borrowings from financial institutions, lease liabilities, and debentures.

The impacts of financial liquidity risks may include the following:

Project Disruption

If the company is unable to secure sufficient working capital, construction projects may experience temporary halts, affecting the planned timeline and budget. This could lead to penalties being paid to clients.


Payment Issues

If cash flow is not managed effectively, the company may fail to pay debts or expenses on time, such as labor wages, material purchases, or other project-related costs. This could strain relationships with suppliers or contractors.


Reduced Negotiating Power

The company may lose its ability to negotiate favorable terms for loans or new contracts with business partners if it is perceived as a company with liquidity issues.

The company manages liquidity risk through a variety of financial instruments, including overdrafts, bank loans, lease agreements, and debentures, to maintain flexibility in cash flow management sufficient for all circumstances. The company also has the ability to negotiate extensions on liabilities due within 12 months with existing lenders, providing additional liquidity management flexibility when needed. Furthermore, the company holds financial assets that are readily realizable and expected to generate sufficient cash inflows to continuously meet the cash outflows of maturing financial liabilities.

Bank and Financial Institution Credit Facilities

The company has secured credit facilities from banks in the form of overdrafts (O/D), promissory notes (P/N), letters of guarantee (L/G), and letters of credit (L/C) to serve as working capital for business operations.

Effective Cash Planning and Management

The company prepares annual budget plans to ensure finances are appropriate and sufficient for operations, while taking into account funding sources that are available at all times.

Consideration of Other Financial Instruments

In addition to bank credit facilities, the company has studied and planned for the use of other financial instruments, such as debt securities and equity fundraising, to broaden options for enhancing financial liquidity.

Regular Financial Position Monitoring and Assessment

The company closely monitors its financial position and expenditures to ensure that working capital for each project is sufficient for operations.

1724 · Description: Liquidity risk · Info category: FINANCIAL_RISK
Liability of the joint venture risk

The risk of participating in joint ventures arises when the company is required to invest and collaborate with external partners based on a mutual agreement. The company will be responsible for fulfilling its obligations in the joint venture project. If the partner fails to adhere to the agreement or is unable to secure the required funding, the company may be obligated to make additional investments or fulfill outstanding obligations. Failure to meet these obligations may lead to damages or consequences from breach of contract in the joint venture.

The impacts of this risk may manifest in various forms, including:


Additional Investment

If the joint venture partner is unable to secure funding or fulfill the agreed-upon obligations, the company may be required to make additional investments. This could result in increased financial burden and affect the company's liquidity.


Claim for Damages

If a claim for damages is made by the project owner, the company may be jointly responsible for the damages resulting from the failure to adhere to the agreement. This could result in unexpected costs for the company.


Reputation Impact

Failure to meet obligations in a joint venture can negatively affect the company's reputation, leading to decreased trust and credibility in the eyes of customers and partners.


Reduced Profit from the Project

If the company is required to cover damages or make additional investments, the profit it would earn from the project may be reduced, impacting overall company profitability.


Impact on Business and Liquidity

The negative effects of a joint venture that does not proceed as planned can cause damage to the business and affect long-term liquidity.

The company can implement various measures to manage risks arising from joint ventures as follows:


Careful Selection of Partners

The company should select joint venture partners who are reputable, financially capable, and possess strong management skills, along with a solid track record of successfully completing previous projects. This reduces the risk of non-compliance with agreements.


Clear Agreement Negotiation

Establishing clear terms in the joint venture contract, such as agreements on funding, profit sharing, and liability in the event of damages, helps mitigate the risk of non-fulfillment of obligations.


Close Monitoring of Operations

The company should have a system in place to continuously monitor and assess the progress of the joint venture to promptly address any issues that arise.


Insurance and Guarantees

The company may consider obtaining insurance or requiring joint venture partners to provide guarantees for compliance with obligations to minimize financial risk.


Establishing a Risk Management Team

Having a dedicated team responsible for assessing and managing risks in joint ventures ensures that potential risks are identified and addressed efficiently.

760 · Other name: Liability of the joint venture risk · Description: Other · Info category: COMPLIANCE_RISK
Interest Rate Risk

The company is exposed to interest rate risk arising from its holdings of financial instruments on both the asset and liability sides, namely bank deposits, short-term borrowings from financial institutions, long-term borrowings from financial institutions, and interest-bearing debentures.

If market interest rates rise, this would directly increase the company's interest expense burden. Sensitivity analysis indicates that a 1% increase in interest rates would result in approximately Baht 6 million of additional interest expense per year, while a 1% decrease would reduce interest expense by approximately Baht 6 million per year. Such interest rate fluctuations could have a significant impact on the company's profitability.

The company accepts interest rate risk at a manageable level, having determined that since most of its financial assets and liabilities carry interest rates that float with market rates, or bear fixed rates closely aligned with current market rates, no derivative instruments are employed to hedge against such risk. The company tolerates interest rate fluctuation risk within its accepted risk appetite by maintaining an appropriate mix of fixed and floating rate debt, as well as managing debt maturities in alignment with expected cash inflows from construction project operations at each relevant period.

764 · Description: Fluctuation in exchange rates, interest rates, or the inflation rate · Info category: FINANCIAL_RISK · 1724 · Description: Liquidity risk · Info category: FINANCIAL_RISK · 1725 · Description: Income volatility · Info category: FINANCIAL_RISK
Foreign Exchange Risk

The company is exposed to significant foreign exchange risk arising from construction services rendered, purchases of goods, acquisitions of machinery and equipment, and advance payments received from clients, all denominated in foreign currencies.

A 10% change in the USD/Baht exchange rate would impact the company's pre-tax profit by approximately Baht 0.6 million, which is considered immaterial to overall operating results. However, should the business continue to expand, foreign exchange risk exposure may increase in proportion to the growing share of international revenue.

The company manages this risk by entering into forward foreign exchange contracts, most of which have maturities of no more than one year, in order to hedge against short-term exchange rate volatility that could affect project cash flows.

764 · Description: Fluctuation in exchange rates, interest rates, or the inflation rate · Info category: FINANCIAL_RISK
Credit Risk

The company is exposed to credit risk in relation to trade receivables, contract assets, and deposits held with banks.

Trade Receivables and Contract Assets

Should debtors fail to make payment when due, the company may be required to recognize credit losses, directly impacting its profit and cash flows.

Bank Deposits

Risk in this area arises from the possibility that counterparty banks may be unable to repay deposits as obligated, which could directly affect the company's liquidity.

Trade Receivables and Contract Assets

The company is exposed to credit risk in relation to trade receivables and contract assets. However, since the group's construction contracts are predominantly entered into with government agencies and creditworthy customers, the group does not expect to incur material losses from extending credit to these debtors beyond the allowance for doubtful accounts already recognized.

The company assesses impairment at each reporting period end. The provisioning rate for expected credit losses is calculated based on the aging of outstanding balances past due date for groups of customers sharing similar credit risk profiles, classified by customer type and credit rating. The calculation of expected credit loss impairment takes into account probability-weighted outcomes, the time value of money, and reasonable and supportable information available at the reporting date regarding past events, current conditions, and forecasts of future economic conditions.

Bank Deposits

The company manages credit risk relating to bank balances by investing only with approved counterparties. The group's credit risk exposure on debt instruments is not significant, as counterparties are banks with high credit ratings as assessed by international credit rating agencies.

763 · Description: Default on payment or exchange of goods · Info category: FINANCIAL_RISK · 1724 · Description: Liquidity risk · Info category: FINANCIAL_RISK

Risks to Securities Holders' Investment

Risk Register

Risk NameRisk CharacteristicsConsequencesManagement MeasuresRelated Risk Factors
Restrictions that shareholders of the Company may be restriced in exercising their rights to purchase ordinary shares of the Company's capital increase in the future

If the Company is listed on the Stock Exchange of Thailand, the Company can raise capital through capital raising. The company can issue new shares in the future and allocate new shares in 3 types: allocation to existing shareholders in proportion to their shareholding (Right Offering: RO), public offering (PO) and allocation to the specific investors (Private Placement: PP) by issuing capital increase shares in the case of allocation to the public and the allocation to the private placement.

The existing shareholders of the company may be restrictions on the exercise of the right to purchase the newly issued ordinary shares of the company.

Since the capital increase of listed companies will have a direct impact on the shareholders’ benefits and the Company’s share price, the Company will disclose information related to the capital increase for the shareholders and general investors to make appropriate investment decisions and in accordance with the relevant criteria.

769 · Other name: Restrictions that shareholders of the Company may be restricted in exercising their rights to purchase ordinary shares of the Company's capital increase in the future · Description: Other · Info category: HOLDER_RISK